Hiway Group works closely with Government departments, regulators, compliance agencies, commercial organisations, land developers and main contractors.
We are continuously researching and developing ways to make our solutions efficient, environmentally superior, cost-effective and economically beneficial wherever possible.
Infrastructure Recycling & Reuse
Subgrade Recycling & Fill Drying
-
B/09 & Beyond – A Stabilised Platform for Performance Pavements
-
Paremoremo Historic Stabilisation Review
-
Te Uku Windfarm Roading Network
Basecourse Recycling & Modification
-
Design Stabilised Pavements
-
Maximising Stabilisation and Recycling Benefits for Sustainable Pavement Performance
-
Quantifying the Intangible Benefits of Stabilisation
Foamed Bitumen Recycling
-
6 Years of Foamed Bitumen Stabilisation in New Zealand
-
Foamed Bitumen Stabilisation in New Zealand
-
Foamed Bitumen Stabilisation Performance Review and Comparison with Australian and South African
-
Operationally Cognisant Design – The Capital Process
-
Where Are We At with Foamed Bitumen – A Contractors Perspective
Stabilisation & Construction
Subgrade Stabilisation & Fill Drying
-
B/09 & Beyond – A Stabilised Platform for Performance Pavements
-
Paremoremo Historic Stabilisation Review
-
Te Uku Windfarm Roading Network
Basecourse Stabilisation
-
Design Stabilised Pavements
-
Maximising Stabilisation and Recycling Benefits for Sustainable Pavement Performance
-
Quantifying the Intangible Benefits of Stabilisation
Foamed Bitumen Stabilisation
-
6 Years of Foamed Bitumen Stabilisation in New Zealand
-
Foamed Bitumen Stabilisation in New Zealand
-
Foamed Bitumen Stabilisation Performance Review and Comparison with Australian and South African
-
Operationally Cognisant Design – The Capital Process
-
Where Are We At with Foamed Bitumen – A Contractors Perspective