Moisture
Conditioning

Hiway Group delivers innovative moisture conditioning pavement subgrades across all of Australia and NZ, with a commitment to innovation, environmental sustainability and industry leadership.

Applications

Construction of new pavements

Moisture conditioning of earthworks for residential subdivisions

Moisture conditioning of earthworks for rail, civil and infrastructure projects

Moisture conditioning of earthworks for industrial and commercial developments

Rehabilitation of existing pavements

Benefits

Significantly improved subgrade stability with strength gains of up to 20 times

Cost savings through reduced requirement for imported aggregates and a faster construction time

Reduces risk of costly earthworks fill and subgrade pavement failures

A robust durable platform that eliminates the need for cloth/grid or imported aggregate

Substantially reduces moisture susceptibility

Reduces plasticity making soils easier to work

More uniform earthworks fill and subgrade layer

Encapsulation and remediation of treated contaminated soils

Dries large volumes of water-logged soil instantly

Can be undertaken in any weather conditions

Reduces down-time by enabling earthworks to continue during the earthworks shoulder seasons

Enables reduced pavement thickness and improves earthworks fill and subgrade performance

Moisture Conditioning

Moisture conditioning of wet material using binder is more cost-effective than cut to waste and importation of good quality fill material.

By conditioning wet-of-optimum moisture content soils after a rain episode, earthworks operations can continue immediately, thereby limiting unproductive down-time. Equally, moisture conditioning of dry materials through the controlled injection of water during the mixing cycle is critical in ensuring adequate compaction is achieved during the road construction process.

The Hiway Group operation is very simple and enables large volumes of material to be dried instantly. Our plant is purpose-built to handle almost any ground condition. This enables earthworks to continue without delay and removes the risk of construction delays attributed to quality assurance test failures and rigorous supervision.

After a rain episode, earthworks operations can continue immediately, limiting unproductive down-time.

Innovation

Hiway Group is committed to delivering solutions with environmental benefits, particularly when considering the treatment of contaminated materials and remediation of contaminated sites to reduce costly excavation and disposal.

Cost & Carbon Calculator

Use Hiway Group’s carbon calculator to determine your potential carbon emission offsetting and cost savings.

Calculate Your Savings

Design & Project Management

Hiway Group’s engineering team has extensive experience in pavement design and project management.

We offer a range of consultancy services, from pavement investigation, sampling and analysis to full pavement design and optimisation.